The goals of the Sparrow1 project are:
Unit | Phase | Current status | notes |
---|---|---|---|
1 | I | Testing out version 4 code | Using a Homework board - serial port interface is by P10/P11 |
2 | II | No controller, no sensor | at HCC |
3 | II | Has the version 1 hardware | uses two 3 volt (type 2032) batteries |
4 | I | Testing out version 4 code | Using a Homework board - serial port interface is by P0 |
5 | II | has the version 2 hardware, needs to be checked | Doesn't fit into a BT-60 tube, at HCC |
6 | II | Completed | "Peter" - for the WCC Quahog flight |
7 | II | planned |
Log files can be found under the "Resources" section of this site and then under the following folder path:
Date | location | unit | version | rocket | motor | log file | notes |
---|---|---|---|---|---|---|---|
03/15/08 | WCC | 2 | V1.04 | Omega 24e | D12-5 | misfire1.txt | scrub due to launch controller problem |
03/15/08 | WCC | 2 | V1.04 | Omega 24e | D12-5 | misfire2.txt | scrub due to launch controller problem |
09/17/08 | BRD | 3 | V1.07 | Omega 24e | E9-4 | black-rock1.TXT | scrub due to dust storm |
09/19/08 | BRD | 3 | V1.07 | Omega 24e | E9-4 | blackrock2.TXT | An actual launch |
12/20/08 | WCC | 5 | V2.11 | Executioner | E9-4 | wcc-122008.TXT | mission #1 (missions 3,4,5 are non flown runs) |
12/20/08 | WCC | 5 | V2.11 | Executioner | E9-4 | wcc-122008.TXT | mission #2 (the rocket landed in place where it was not recovered until 12/23/08) |
04/17/10 | BF | 6 | V4.09 | Leo Hano | K510 | 04-17-sparrow1-u6.txt | |
10/16/10 | WCC | 6 | V4.09 | Omega 24e-H1 | C11-3 | sp1-v4-09-u6-m6.TXT | |
11/20/10 | WCC | 6 | V4.09 | Omega 24e-H1 | C11-3 | sp1-v4-09-u6-m7.TXT |